Progra#Mjbved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Plan for an AMP Program Author: Edwin C. May, Ph.D. 23 February 1994 I Az SdenwAppfica s rn 9do n 3f Corpomdon An Employee-Owned Company Presented to: U. S. Government Submitted by: Science Applications International Corporation Cognitive Sciences Laboratory 10 10 El Camino Real, Suite 330, P. 0. Box 1412, Menlo Park, CA. 94025 - (415) 325-8292 Other SA,~ekvdqf;orsReUasep2OO3,M/46-114[AAvRBPNgG67QLi4ROO02882WM A& Seattle. Tucson PrograrAlbotWed For Release 2003/04/18 : CIA-RDP96-00791 R000200j§db#fjMry 1994 A 5-YEAR PLAN FOR AN AMP PROGRAM IntroductIon: Due to strong advancements in the three-fold area of anomalous mental phenomena (AMP): insight into foreign activity, breakthroughs in research, and a substantial base of ptima facie evidence for AMP's capabilities in applications, we recommend that a comprehensive, integrated, systematic, 5-year program begin in November 1994 for a total cost of $10.0 M. The goals to be achieved by the end of this period will be: ~ Task-selection. Which problems are best suited for an AMP-resolution? ~ Personnel-selection Who, or what type of individuals are best suited as providers for AMP data? ~ Tkaining manuals What are the best training techniques to improve the quality of the data? ~ A priori assessment and data fusion. What is the best way to determine the value of AMP data and how can the data be integrated with other appropriate information? We define AMP as either: (1) the exclusively mental human ability to gain access to information that is fully-secured by shielding, distance, or time; or, (2) the exclusively mental human ability to affect changes in physical, chemical, or biological systems. A comprehensive AMP program must firmly inte- grate the three areas of foreign assessment, applications, and research. In addition, such a program must build upon the twenty years of accumulated knowledge of research and applications garnered from previous programs. This note outlines a two-phase approach for a 5-year integrated program to achieve the stated goals. Phase I - Start-up: We recommend that during a 6-month start-up period (May through October 1994), we prepare for the full program by initiating activity in all three areas of interest in AMR Significant political changes in the world have afforded us opportunities to engage in cooperative re- search and applications with foreign scientists that were previously impossible. Therefore, for the for- eign assessment part of Phase 1, we will: 9 Negotiate formal agreements with appropriate foreign research institutes and laboratories in the FSU. Over the years, successful applications of AMP have clearly exhibited solid pfima facie evidence for AMP's capabflities.Ib address applications in Phase 1, we will: 0 Administer an orderly transfer of applications to the private sector and conduct base-line, applica- tion test-bed trials in which total ground-truth is available to calibrate the new participants. Recent breakthroughs in research indicate what is being "sensed" by AMP and that the brain reacts similarly to AMP as it does to other sensorial stimuli, such as light flashes. Therefore, for research during Phase I, we will: ~ Conduct a series of highly focused, mini-conferences with national-class scientists to help identify specific experiments that are most likely to reveal the fundamentals of AMR ~ Expand the current research facility to include an appropriate laboratory in which to conduct human physiology experiments. The approximate cost of the Phase I start-up is $600 K. PrepaAM12F9.vEMWaiCRMe%-qei,20.03/04/18 : CIA-RDP96-00791ROO0200280001-6 ProgranvtAftved For Release 2003/04/18: CIA-RDP96-00791 R00020GIMWIMY 1994 Phase 11 - The First TWo Years: In November 1994, we will begin the core of the 5-year program. Through subcontracting with foreign research institutes, we will vigorously pursue an overall assessment of their work. Using the technical and administrative techniques put in place during Phase I, we will apply AMP to problems of national interest in a systematic way. Through careful analysis, we will then be able to identify cost-effective applications. Depending upon the outcome of the mini-conferences in Phase I, we will conduct specific experiments to improve both our understanding of AMP and its quality. Specific research domains will include: ~ Using traditional approaches (e.g., hypnotic susceptibility) as an aide to selecting individuals with native AMP ability. ~ Developing AMP training techniques, which are based upon proven traditional methodologies from leaning theory. ~ Improving application evaluations to include a prioti estimates of the accuracy of the data. ~ Continuing basic research into the brain's response to AMP and into the physics of the phenomena. The cost of Phase II from November 1994 through October 1996 is approximately $4.0 M. Phase 11 - The Final Three Years: During this time period, foreign assessment through cooperative agreements will be expanded beyond our current contacts to include the People's Republic of China and Japan. Concurrently, we will begin an orderly transfer of the application activity back to an appropriate government organization. Where- as the research during these three years will be strongly dependent upon the experimental results from the first two years, we are unable to be specific at this time. We can, however, indicate our general ap- proach. Research included during this period will be: ~ Required to show previous success and value. ~ Focused at understanding the phenomena or improving the quality of the data. ~ Natural extensions of previous research. The cost of the Phase H from November 1996 through October 1999 is approximately $6.0 M. Oversight: Th assure that the program addresses problems that are relevant to the government and that it meets all accepted criteria for scientific excellence, we recommend significant scientific and policy monitoring. We plan to increase the involvement of our in-place oversight committees, which have previously been resource limited, by adding missing but critical disciplines to their membership and by increasing their responsibilities to include developing criteria that must be met for the program to continue. Our cur- rent Scientific Oversight Committee and our Institutional Review Board (i.e., human-use committee) are staffed by Nobel prize winners, university department heads, and others renowned in the physical, psychological, and medical sciences. Thus, recommendations for the program's continuation will be based upon the reasoning of some of the best scientific minds in the nation. We further suggest the development of a group consisting of- the government's program director, se- lected recipients of the project's application and foreign assessment data, selected members of the proj- ect's oversight committees, and the contractor's program director. This group would meet formally on an annual basis with selected representatives of relevant Congressional committees for the purpose of keeping them directly informed of the project. Conclusions: We recommend that a comprehensive and integrated 5-year AMP program begin in November 1994 for a total cost of $10.0 M. In preparation for this program, we further suggest a 6-month start-up phase that will begin in May 1994 for a cost of $600 K. During the life of the 5-year program, we will actively work to integrate the research and application areas of AMP with an on-going assessment of similar AMP activity in other countries and will evaluate to what degree this foreign activity poses serious competition. PrepareAftccE"ffGr Nftl@MdVeI2003/04/18 : CIA-RDP96-00791ROO0200280001-6 2 Approved For Release 2003/04/18: CIA-RDP96-00791ROO0200280001-6 A 5-Yeat Program Plan lor Anomalous Mental Phenomena (U) 1. BIBLIOGRAPHY (U) 1.1976 1. Puthoff, H.E., Targ, R., "Remote Sensing Experiments from March to August 1976," SRI International, Menlo Park, CA (9/76), UNCLASSIFIED. 2. Puthoff, H., Targ, R., "Interim Engineering Report 1 "Advanced Threat Tbchnique Assessment (covering the period 15 April 1975 to 15 April 1976), (U)," Project 7403, SRI International, Menlo Park, CA, (10N), SECRET 3. Thrg, E., Puthoff, H.E., May, E.C., "EEG Correlates to Remote Stimuli Under Conditions of Sensory Shielding, Bulletin of the APS, 21 (1976), 1306 UNCLASSIFIED. 2.1977 4. Puthoff, H., Thrg, R., May, E.C., "Final Report (1977), 'Advanced Threat Technique Assessment (covering the period 15 April 1976 to 15 April 1977), (U)," Project 7403, SRI International, Menlo Park, CA, (7/77), SECRET. 5. Thrg, R., Puthoff, H.E., May, E.C., "State of the Art in Remote Viewing Studies at SRI," Proceedings of the International Conference on Cybernetics and Society, IEE, 77 CH 1259-1 SMC, (1977), UNCLASSIFIED. 6. May, E.C., (Consultant), Thrg, R., Puthoff, H.E., SRI International, "Possible EEG Correlates Th Remote Stimuli Under Conditions of Sensory Shielding, "Electro 71 Professional Program, Special Session: The State of the Art in Psychic Research, IEE, New York, NY (April 1977), UNCLASSIFIED. 7. Puthoff, H.E., Targ, R., May, E.C., "Psychoenergetic Research," SRI International, Menlo Park, CA, (March 1977), UNCLASSIFIED. 3.1978 8. "Photograph of Site (U)," Wright- Patterson AFB, OH (4/78), Project 7403, SECRET SG1J 9. "Preliminary Analysis of 4 RV Experiments Run at DIA by SRI (U)," DIA, Washington, ), Project 7560, SECRET. SG1J 10. Puthoff, H., Tbxg, R., May, E.C., 'Final Report, Advanced Threat Technique Assessment (Covering the Period 18 15 April 1978, black tape bound, cream covers (repro mats are under SRI 9-4016), (U)," Project 7403, SRI International, Menlo Park, CA, (10178), SECRET. 11. Puthoff, H., T@rg, R., "Proposal No. ESU 78-12 Novel Intelligence Collection Rchniques (U)," Project 7560, SRI International, Menlo Park, CA, (5/78), SECRET. 12. Puthoff, H., Targ, R., "Proposal for Research SRI No. ESU 78- 100 - Special Tkaining Techniques (U)," Project 8465, SRI International, Menlo Park, CA, (10[78), SECRET. Approved For Release 2003/04/18: CIA-RDP96-00791ROO0200280001-6 1311 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 13. Tbtrg, R., May, E. C., Puthoff, H. E., SRI International, Menlo Park, CA, Galin, D., Ornstein, R., (Consultants), Langley Porter Neuropsychiatric Institute, San Francisco, CA, "Sensing of Remote EM Sources (Physiological Correlates)," SRI International, Menlo Park, CA, Final Report, SRI Project 4540, (April 1978), UNCLASSIFIED. 14. Puthoff, H.E., 11trg, R., May, E.C., "Psychoenergetic Research: Suggested Approaches," SRI International, Menlo Park, CA (May 1978), UNCLASSIFIED. 15. Puthoff, H.E., Targ, R., "Standard Remote-Viewing Protocol (Local Targets)," SRI International, Menlo Park, CA (11178), UNCLASSIFIED. 4.1979 16. Puthoff, H., Thrg, R., "Proposal No. ESU 79-107 (extension to ESU 7560), Novel Intelligence Collection (NIC), Tbchniques (U)," Project 7560, SRI International, Menlo Park, CA, (6/79), SECRET 17. May, E.C., "Executive Summary - GF Protocol: Thsk II (U)," Project 8585, SRI International, Menlo Park, CA, (11/79), SECRET 18. Puthoff, H. E., Thrg, R., May, E. C., "Standard Remote Viewing (RV), Procedures: Local Sites," SRI International, Menlo Park, CA, (August 1979), UNCLASSIFIED. 19. Puthoff, H. E., Targ, R., May, E. C., "Experimental PSI Research: Implications for Physics," SRI International, Menlo Park, CA, (July 1979), UNCLASSIFIED. 20. Puthoff, H.E., Thrg, R., Tart, C.T, "Resolution in Remote Viewing Studies: Mini-Thrgets," SRI International, Menlo Park, CA (07M), UNCLASSIFIED. 21. Puthoff, H.E., Thrg, R., Tart, C.T, "Resolution in Remote Viewing Studies: Mini-and Micro -Thrgets," SRI International, Menlo Park, CA (06/79), UNCLASSIFIED. 22. Thrg, R., Puthoff, H.E., Humphrey, B.S., Tart, C.T, "Investigations of Thrget Acquisition," SRI International, Menlo Park, CA (07/79), UNCLASSIFIED. 5.1980 23. Puthoff, H., "Feasibility Study on the Use of RV Detection Rchniques ... (Informal Proposal), (U)," Project 8465, SRI International, Menlo Park, CA, (8/80), SECRET 24. May, E.C., "Quarterly Reports 1 & 2 Phase 1: Hardware Construction and System Evaluation), (U)," Project 8485, SRI International, Menlo Park, CA, (6/80), SECRET. 25. May, E.C., Humphrey, B.S., Hubbard, G.S., "8585 Final Report - Electronic System Perturbation Techniques (covering the period 2 June 1979 to 2 August 1980 (U)," Project 8585, SRI International, Menlo Park, CA, (10/80), SECRET. 26. Thrg, R., "Final Report Covering Period I May 79 to 31 March 80, Special Orientation Techniques (U)," Project 8465, SRI International, Menlo Park, CA, (6/80), SECRET. , 27. Puthoff, H., "Evaluation Sheets - Instructions to Analysts; Operational TbLrget File; Summary Evaluation Sheet; Detailed Evaluation Sheet; Request for Additional Information (U)," Project 7560, SRI International, Menlo Park, CA, (11/80), SECRET 28. Puthoff, H., "Memo - AMSAA "10" CRV Thsk (U)," Project 8465, SRI International, Menlo Park, CA, (2/80), SECRET 29. Puthoff, H., "Memo to Dan Murdock regarding Reactor Location Task (U)," Project 8465, SRI International, Menlo Park, CA, (7/80), SECRET. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 132 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 30. Puthoff, H., "Letter to Krarnar regarding Reactor Location Task (U)," Project 8465, SRI SG1J International, Menlo Park, CA, (7/80), SECRET. 31. GF Memorandum of Understanding (U)," DIA, Washington, DC, (2/81), Project 7560, SG1J 1 7 "Statement of Work: Novel Intelligence Collection Techniques (Psychoenergetics -Threat to U.S. and Potential Applications (U)," DIA, Washington, DC, (11/80), Project 7560, SECRET 32. Puthoff, H., Targ, R., "Proposal No. ESU 80-53 Novel Intelligence Collection Rchniques (U)," Project 7560, SRI International, Menlo Park, CA, (3/80), SECRET 33. Puthoff, H., Targ, R., "Proposal No. ESU 80-53 Novel Intelligence Collection T@chniques (U)," Project 7560, SRI International, Menlo Park, CA, (8/80), SECRET. SG1J 34. Puthoff, H., "Memo to= Regarding Categories of Operational RV Targets (U)," Project 7560, SRI International, Menlo Park, CA, (11/80), SECRET. 35. May, E.C., "Quarterly Report 3 -Phase 11 Test Plan (U)," Project 8585, SRI International, Menlo Park, CA, (5180), SECRET 36. Puthoff, H., "Letter to LaBerge Regarding R&D in GF Program (U)," Project 8465, SRI International, Menlo Park, CA, (3/80), SECRET. 37. Puthoff, H., "Proposal No. ESU 80-231 "Advanced Technology Assessment" (U)," Project 1560, SRI International, Menlo Park, CA, (12/80), SECRET. 38. May, E.C., Humphrey, B.S., 'A Data-Base Management System (U)," Project 8585, SRI SG1J International, Menlo Park, CA, (11/80), SECRET 39. "Letter from Perry (Under Secretary of Defense), to Army, Navy, and Air Force GF Activity (U)," DIA, Washington, DC, (3/80), Project 7560, SECRET SG1J 40. "Edited Version of Paraphysis R&D - Warsaw (U)," DIA, Washington, DC, (2/80), Project 7560, SECRET. 41. Targ, R., Puthoff, H. E., May, E. C., Haray, K. (Consultant), "Psychoenergetic Research," SRI International, Menlo Park, CA, Proposal for Research, SRI International No. ESC 80-219-1, (December 1980), UNCI.ASSIFIED. 42. May, E. C., Humphrey, B. S., Hubbard, G.S., "Electronic System Perturbation Techniques," SRI International, Menlo Park, CA, Final Report, Project 8585, SRI/GF-0088, (September 1980), UNCLASSIFIED. 43. May, E. C., Puthoff, H. E., "Feasibility on the Use of RV Detection Techniques to Determine Location of Thrgets," SRI International, Menlo Park, CA, SRI/GF-0039, (August 1980), UNCLASSIFIED. 44. May, E. C., Hubbard, G.S. (Consultant), "Phase I: Hardware Construction and System Evaluation," SRI International, Menlo Park, CA, Quarterly Reports 1 & 2, SRI/GF-0086, (June 1980), UNCLASSIFIED. 45. lhrg, R., Puthoff, H. E., Humphrey, B. S., May, E. C., "Special Orientation Techniques," SRI International, Menlo Park, CA, Final Report, SRI/GF-0091, (June 1980), UNCLASSIFIED. 46. May, E. C., Hubbard, G.S. (Consultant), "Phase I: Hardware Construction and System Evaluation," SRI International, Menlo- Park, CA, Quarterly Reports 1 & 2, (June 1980), UNCLASSIFIED. 47. May, E. C., Humphrey, B. S., Hubbard, G.S. (Consultant), "Phase II Tbst Plan," SRI International, Menlo Park, CA, Quarterly Report 3, (May 1980), UNCLASSIFIED. Approved For Release 2003/04/18 : CIA-RDP96-00791ROO0200280001-6 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 6.1981 48. Humphrey, B.S., Langford, G., "Review of the Psychoenergetics, Research Organization in the Soviet Union (1960 to 1980), (U)," Project 3279, SRI International, Menlo Park, CA, (10/81), SECRET 49. May, E.C., "Proposal ESU 81-192 to VA Contracting Activity "NIC Techniques" (U), Project 3279, SRI International, Menlo Park, CA, (10/81), SECRET 50. Humphrey, B.S., "Memo regarding Security of Intelligence Project (U)," Project 3279, SRI SG1J International, Menlo Park, CA, (6/81), SECRET. 51. F------- IFY'81 DoD Grill Flame Progress Report (U)," Project 3279, SRI International, Menlo Park, CA, 11/81), SECRET. 52. Puthoff, H., May, E.C., "Feasibility Study on the of the MPS System ... (2nd Revision), (U)," Project 8465, SRI International, Menlo Park, CA, (2/81), SECRET. 53. Puthoff, H., May, E.C., "Feasibility Study on the Use of RV Detection T@chniques to Determine Location of. . . (Revised version of SRI 0-4351), (U)," Project 7560, SRI International, Menlo Park, CA, (4/81), SECRET SG1J 54. "DoD Grill Flame Progress Report (U)," DIA, Washington, DC, (4/81), Project 9529, SECRET 55. Puthoff, H., "Proposal ESU 81-60 "NIC Techniques (U)," Project 7560, SRI International, Menlo Park, CA, (3/81); SECRET. SG1J 56. May, E.C., "Memo to Data Base Management System, PY, and Suggestions for 1981-1982 (U)," Project 7560, SRI International, Menlo Park, CA, (3/81), SECRET 57. Humphrey, B.S., "Associational Remote Viewing Protocol for Novice Subjects (U)," Project 9516, SRI International, Menlo Park, CA, (3/81), SECRET 58. Puthoff, H., "Proposal No. ESU 81-6 "NIC Techniques" (U)," Project 7560, SRI International, Menlo Park, CA, (1/81), SECRET. 59. Hubbard, G.S. (Consultant), May, E. C., "Macro-Remote Action: A Survey and Evaluation," SRI International, Menlo Park, CA, Final Report, Project 3279-3, SRI/GF-0011, (January 1981), UNCLASSIFIED. 60. May, E. C. Puthoff, H. E., "Feasibility Study on the Use of RV Detection Techniques to Determine Location of Targets,".SRI International, Menlo Park, CA, SRI/GF-0038, Revised (April 1981), UNCLASSIFIED. 61. May, E. C., Humphrey, B. S., Targ, R., Puthoff, H. E., "A Demonstration- of -Ability Experiment for Oil Exploration: A Protocol," SRI International, Menlo Park, CA, (April 1981), UNCLASSIFIED. 62. Thrg, R., Puthoff, H. E., May, E. C., "Psychoenergetic Applications," SRI International, Menlo Park, CA, Proposal for Research ESC 81-5, (January 1981), UNCLASSIFIED. 63. May, E.C., "Must Consciousness be Incorporated into the Wave Function? "A Technological Schrodinger Cat Experiment," SRI International, Menlo Park, CA (April 1981), UNCLASSIFIED. 7.1982 64. May, E.C., "Database Management Feasibility, Final Report Covering Period October 1980 to September 1981 (U)," Project 3279, SRI International, Menlo Park, CA, (1/82), SECRET. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 134 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 65. Hubbard, G.S., May, E.C., "Countermeasures: A Survey and Evaluation, Final Report Covering Period October 1980 to September 1981 (U)," Project 3279, SRI International, Menlo Park, CA, (1/82), SECRET. SG1J 66.1 "Memo - After Action Report (U)," DIX Washington, DC, (2/82), Project 4028, SECRET 67. Puthoff, H., "RV Reliability, Enhancement, and Evaluation (U)," Project 3279, SRI International, Menlo Park, CA, (2@82), SECRET. 68. May, E.C., Hecker, M., "Final Report - Audiolinguistic Correlations with the Quality of Remote Viewing Sessions (U)," Project 4028, SRI International, Menlo Park, CA, (4/82), SECRET. SG1J 69. "FY'82 Mid-Year DoD GF Progress Report (U)," DIX Washington, DC, (4/82), 28,SECRET 70. Puthoff, H., I'hrg, R., Humphrey, B.S., Harary, K., "Final Report - Targeting Requirements Thsk (U)," Project 3279-4, SRI International, Menlo Park, CA, (5/82), SECRET. 71. Puthoff, H., "GFWorking Group - SRI-MICON-AMSAA Response to Gale Report plus Perry Memo and Responses (U)," Project 4028, SRI International, Menlo Park, CA, (7/82), SECRET. SG1J 72. "FY '82 End-of-Year DoD GF Progress Report (Admin Report), (U)," DIX Washington, DC, (10/82), Project 4024, SECRET 73. Puthoff, H., "Final Report "Psychoenergetics Research in PRC (1982), (Covering period October 1981 to October 1982), (U)," Project 4028, SRI International, Menlo Park, CA, (10/82), SECRET. 74. May, E.C., "Final Report "A Remote Viewing Evaluation Protocol (Covering the Period October 1981 to October 1982), (U)," Project 4028., SRI International, Menlo Park, CA, (12/82), SECRET 75. Puthoff, H., "Final Report "RV Reliability, Enhancement, and Evaluation (Covering the Period October 1981 to September 1982), (U)," Project 4028, SRI International, Menlo Park, CA, (12/82), SECRET SG1J 76.1 "First Draft of 1983 Statement of Work "Psi - Threat to US & Potential Applications" (U)," DIX Washington, DC, (7/82), Project 4028, SECRET 77. Puthoff, H., "Draft (Approval Copy), Final Report - Psychoenergetics Research in the People's Republic of China (1982), (U)," Project 4028, SRI International, Menlo Park, CA, (10/82), SECRET SG1J 78. Puthoff, R., "Memo to Regarding RV Training, FY'83 (U)," Project 4028, SRI International, Menlo Park, CA, (1 /82), SECRET 79. Puthoff, H., "Proposal ESU 82-157 "NIC Techniques" FY'83 (U)," Project 4028, SRI International, Menlo Park, CA, (9/82), SECRET SG1J 80. =1 "Memo to Vorona Regarding: GF Recent Accomplishments (U)," DIX Washington, DC, (7/82), Froject 4UZ8, SECRET 81. May, E.C., Puthoff, H., "RV Detection Techniques (U)," Project 4028, SRI International, Menlo Park, CA, (3/82), SECRET 82. May, E. C., "A Remote Viewing Evaluation Protocol," SRI International, Menlo Park, CA, Final . Report, Project 4028 SRI/GF- 0226, (December 1982), UNCLASSIFIED. 83. May, E. C., "Investigation of a Novel Approach to Support Utilization of Landsat Data," SRI International, Menlo Park, CA, Proposal for Research SRI International No. ESU 82-127, (July 1982), UNCLASSIFIED. 84. May, E. C., Hecker, M.H.L., "Audiolinguistic Correlations with the Quality of Remote Viewing Sessions," SRI International, Menlo Park, CA, Final Report, Project 3279-5, SRI/GF-0027, (April 1982), UNCLASSIFIED. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 135 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 85. May, E. C., "Database Management Feasibility," SRI International, Menlo Park, CA, Final Report, Project 3279-7, SRI/GF-0010, (January 1982), UNCLASSIFIED. 86. May, E.C., "A Hardware Approach 'Ibward Replicability," SRI International, Menlo Park, CA (August 1982), UNCLASSIFIED. 8.1983 87. May, E.C., "White Paper - Vulnerability of Physical Systems to Remote Influences (U)," Project Preproposal, SRI International, Menlo Park, CA, (1/83), SECRET SG1J 88. "Fact Book "Project Grill Flame" (U)," DIA, Washington, DC, (1/83), Project 4028, SG1J cc 89. -project Grill Flame "Operational Tasks" (Success Book), (U)," DIA, Washington, DC, (1/83), Project 4028, SECRET 90. Puthoff, H., Humphrey, B.S., "Project Compass Evaluation (U)," Project 4028, SRI International, Menlo Park, CA, (2/83), SECRET. SG1J 91. , "FY'83 Mid-Year DoD GF Progress Report (U)," DIA, Washington, DC, (4/83), Project 4028, SECRET 92. Puthoff, H., "Psychoenergetics 1984-1989 An Informal, Nontechnical Guideline (U)," Project 4028, SRI International, Menlo Park, CA@ (6/83), SECRET. 93. Puthoff, H., "Support Document - Psychoenergetics R&D (Draft), (U)," Project 4028, SRI International, Menlo Park, CA, (6/83), SECRET. 94. May, E.C.,"Revised Edition of "A Remote Viewing Evaluation Protocol (U)," Project 4028, SRI International, Menlo Park, CA, (7/83), SECRET 95. Puthoff, H., "Proposal ESU 83-99 "NIC Techniques" (U)," Project 4028, SRI International, Menlo Park, CA, (7/83), SECRET. 96. Puthoff, H., "Psychoenergetic Research - Science Panel Meeting (U)," Project 4028, SRI International, Menlo Park, CA, (8/83), SECRET. 97. Swann, I., "Co-ordinate Remote Viewing (CRV), Technology (1981-1983), Three-Year Project Draft," Project 4028, New York, NY, (9/83), SECRET SG1J 98. "Three Year Grill Flame Program (wrap up report), (U)," DIA, Washington, DC, (9/83), Project 4028, SECRET SG1J 99. = "Fy 1983 End-of-Year DoD GF Progress Report (U)," DIA, Washington, PC, (10/83), Project Q28, SECRET 100. May, E.C., "Final Report "Data Base Management Facility (Covering Period October 1982 to September 1983), (U)," Project 4028, SRI International, Menlo Park, CA, (1/83), SECRET 101. May, E.C., Humphrey, B.S., "Final Report "Free World Psychoenergetics Research Survey (Covering Period October 1982 to September 1983 (U)," Project 4028, SRI International, Menlo Park, CA, (1/83), SECRET SG1J 102. "DoD Psychoenergetics Program R&D (U)," DIA, Washington, DC, (11/83), Project RET. 103. Puthoff, H., May, E.C., Humphrey, B.S., "Final Report "QRT Thsking" (Covering the Period October 1983 to October 1984), (U)," Project 7408, SRI International, Menlo Park, CA, (11/84), SECRET. Wj 104 "Memo to Regarding Additional Tasks (U)," DIA, Washington, DC, (5/83), Project 5590, SECR Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B6 A.pproved For Release 2003/04/18: QIA-RDP96- 91 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena 78T 105. Puthoff, H., "Memo: Special Orientation T@chnique (Stage I - Stage III (U)," Project 5590, SRI International, Menlo Park, CA, (5/83), SECRET 106. Puthoff, H., "Memo: Special Orientation Techniques (Stage V - Stage VI), (U)," Project 5590, SRI International, Menlo Park, CA, (5/83), SECRET. 107. Puthoff, H., May, E.C., "Proposal ESU 83-134 - Personnel Identification and Selection (U)," Project 5590, SRI International, Menlo Park, CA, (10/83), SECRET 108. Puthoff, H., May, E.C., "Proposal ESU 83-144 "Target Search Techniques" (U)," Project 5590, SRI International, Menlo Park, CA, (10/83), SECRET 109. Puthoff, H., May, E.C., "Proposal ESU 83 - 144 "Special Orientation Techniques (SI - III)" (U)," Project-5590, SRI International, Menlo Park, CA, (10/83), SECRET. 110. Puthoff, H., "Proposal ESU 83-148 "Special Orientation Techniques (SV-SVI)" (U)," Project 5590, SRI Intemational, Menlo Park, CA, (10/83), SECRET. 111. May, E.C., "Letter Regarding: No Proposal for Alternative Training (U)," Project 5590, SRI International, Menlo Park, CA, (10/83), SECRET. 112. Puthoff, H., "SRI Proposal ESU 83 -147 "Geophysical Factors/ELF/RV Correlation Study (U)," Project 5590, SRI International, Menlo Park, CA, (10/83), SECRET 113. May, E.C., "Letter: Status Report on Screening/Selection Thsk (U)," Project 6600, SRI International, Menlo Park, CA, (12/83), SECRET. 114. Puthoff, H., "Draft Memo Regarding Expansion of Scope, DELEW-I-L, Letter Order No. 18 dated 7 November 1983 (U)," Project 6600, SRI International, Menlo Park, CA, (10/83), SECRET 115. Puthoff, H., May, E.C., Adams, M., "Draft of ESU 83-147 - Geophysical Factors/ELF/RV Correlation Study (U)," Project 5590, SRI International, Menlo Park, CA, (10/83), SECRET. 116. Puthoff, H., "Page Changes and Additions for the Fact Books (U)," Project 4028, SRI International, Menlo Park, CA, (4/83), SECRET 117. Puthoff, H., "Draft - Status Report - Special Orientaiton Technique: SIII-SIV (U)," Project 5590, SRI International, Menlo Park, CA, (9/83), SECRET. 118. Humphrey, B. S., May, E. C., "Free World Psychoenergetics Research Survey," SRI International, Menlo Park, CA, Final Report, SRI/GF-0258, (November 1983), UNCLASSIFIED. 119. May, E. C., Puthoff, H. E., "Personnel Identification and Selection," SRI International, Menlo Park, CA, Proposal for Research Number 83-134, SRI/CL-0004, (September 1983), UNCLASSIFIED. 120. May, E. C., 'A Remote Viewing evaluation Protocol," SRI International, Menlo Park, CA, Final Report, SRI/GF-0247, Revised (July 1983), UNCLASSIFIED. 121. May, E. C., "Vulnerability of Physical Systems to Remote Influences," SRI International, Menlo Park, CA, White Paper, SRI/GF-0223, (January 1983), UNCLASSIFIED. 9.1984 122. May, E.C., "Final Report "RV Reliability Enhancement and Evaluation (U)," Project 4028, SRI International, Menlo Park, CA, (1/84), SECRET 123. May, E.C., Humphrey, B.S., "Proposal - ESU 84-85 "Psychoenergetics Studies (U)," Project 7072, SRI International, Menlo Park, CA, (2/84), SECRET. 124. May, E.C., Puthoff, H.,"Summary Report ". . . Replication Studies (U)," Project 6600, SRI International, Menlo Park, CA, (2/84), SECRET. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 137 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 125. Puthoff, H., "NIC T@chniques - FY 1985 Plan), (Semi Proposal), (U)," Project 6600, SRI International, Menlo Park, CA, (2/84), SECRET 126. Puthoff, H., May, E.C., "Proposal ESU 84-40 NIC Techniques (U)," Project 7408, SRI International, Menlo Park, CA, (5/84), SECRET 127. Puthoff, H., May, E.C., "Psychoenergetics Program (FY 1985), (Proposal Plan), (U)," Project 7408, SRI International, Menlo Park, CA, (9/84), SECRET. 128. Puthoff, H., "Memo to Record: Regarding Thrg aip to USSR (U)," Project 7408, SRI International, Menlo Park, CA, (11/84), SECRET. 129. May, E.C., "Final Report "Data Base Management (Covering the Period October 1983 to October 1984), (U)," Project 7408, SRI International, Menlo Park, CA, (12/84), SECRET 130. Puthoff, H.Jbomson, M., "Final Report "Track 1 Tkaining R&D (C overing the Period October 1983 to October 1984), (U)," Project 7408, SRI International, Menlo Park, CA, (12/84), SECRET. 131. May, E.C., "Minutes Weekly Meeting (U)," Project 6600, SRI International, Menlo Park, CA, (1/84), SECRET. 132. Puthoff, H., "Draft Proposal - ESU 84-157 "Special Orientation Techniques (SI-SIVY, (U)", Project 6600, SRI International, Menlo Park, CA, (6/84), SECRET 133. Puthoff, H., "Draft Proposal - ESU 84-158 "Special Orientation Techniques (SI-SIV)" (U)," Project 6600, SRI International, Menlo Park, CA, (6/84), SECRET. 134. Puthoff, H., "Final Report "Special Orientation Tbchniques (S-IV)" (Covering Period 1 February 1983 to 30 April 1984), (U)," Project 5590, SRI International, Menlo Park, CA, (7/84), SECRET 135. Puthoff, H., Adams, M., "Interim Report "Geophysical Effects Study (U)," Project 6600, SRI International, Menlo Park, CA, (7/84), SECRET 136. Puthoff, H., "Final Report "Special Orientation Techniques": S-I, S-H, S-III, (Covering the Period 15 November 83 to 15 December 1984), (U)," Project 6600, SRI International, Menlo Park, CA, (12/84), SECRET. 137. Puthoff, H., "Final Report "Special Orientation Techniques": S-V, S-VI, (Covering the Period 15 November 1983 to 15 December 1984), (U)," Project 6600, SRI International, Menlo Park, CA, (12/84), SECRET. 138. Puthoff, H., May, E.C., "Final Report "Thrget Search Techniques," (Covering the Period 15 November 83 to 15 December 1984), (U)," Project 6600, SRI International, Menlo Park, CA, (12/84), SECRET. 139. Adams, M., Puthoff, H., "Final Report "Geophysical Effects Study" (Covering the Period 15 November 1983 to December 1984), (U)," Project 6600, SRI International, Menlo Park, CA, (12/84), SECRET. 140. May, E.C., Saunders, D., "Final Report "Personnel Identification and Selection (Covering the Period 15 November 1983 to 15 December 1984), (U)," Project 6600, SRI International, Menlo Park, CA, (12/84), SECRET 141. Puthoff, H., May, E.C., "Draft Interim Report "Target Search Techniques" (U)," Project 6600, SRI International, Menlo Park, CA,.(10/84), SECRET 142. Puthoff, H., Adams, M., "Draft Interim Report "Geophysical Effects Study" (U)," Project 6600, SRI International, Menlo Park, CA, (7/84), SECRET. 143. Puthoff, H., "Draft Final Report "Special Orientation T@chniques: S-IV (Covering Period 1 February 1983 to 30 April 1984 (U)," Project 5590, SRI International, Menlo Park, CA, (7/84), SECRET. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 138 Approved For Release 2003/04/18 : CIA-RDP96-00791ROO0200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 144. Puthoff, H., "Approved PDC for: Final Report "Special Orientaiton Techniques SIV (U)," Project 6600, SRI International, Menlo Park, CA, (8/84), SECRET. 145. May, E. C., "Data Base Management," SRI International, Menlo Park, CA, Project 7408-11, SRI/GF-0269, (December 1984), UNCLASSIFIED. 146. Saunder, D., (SRI Consultant), May, E. C., "Personnel Identification and Selection," SRI International, Menlo Park, CA, Final Report, SRI Project 6600, SRI/CL-0028, (December 1984), UNCLASSIFIED. 147. Puthoff, H. E., May, E. C.,"Target Search Techniques," SRI International, Menlo Park, CA, Final Report, SRI Project 6600, SRI/CL-0026, (December 1984), UNCLASSIFIED. 148. Puthoff, H. E., May, E. C., Humphrey, B. S., "ORT Tasking," SRI International, Menlo Park, CA, Final Report, Project 7408-13, SRIIGF-0267, (November 1984), UNCLASSIFIED. 149. Puthoff, H. E., May, E. C., Leonard, R. S., "Psychoenergetics Program (FY 85)," SRI International, Menlo Park, CA, SRI/GF-0266, (September 1984), UNCLASSIFIED. 150. Puthoff, H. E., May, E. C., "NIC Rchniques," SRI International, Menlo Park, CA, Proposal for Research, Proposal Number SRI ESU 84- 40, SRI/GF-0264, (May 1984), UNCLASSIFIED. 10. 1985 151. Puthoff, H., May, E.C., "Draft Proposal ESU 94-246 (R), "Psychoenergetics Program (FY SG1J 1985)" (U)," Project 7859, SRI International, Menlo Park, CA, (1/85), SECRET "FY 1984 End -of -Year DoD GF Progress Report (U)," DIA, Washington, DC, (2/85), 152C: 408, SECRET roject@ 153. Puthoff, H., May, E.C., "Proposal ESU 84-246 (Rev-2), Enhanced Human Performance Investigation (a 5-year Program Proposal, to begin in Fiscal Year 1985), (U)," Project 7859, SRI International, Menlo Park, CA, (4/85), SECRET 154. Puthoff, H., May, E.C., "Appendices to Proposal ESU 84 - 246 (Rev - 2), - Part TWo (Section 11), (Compilation of Various SRI Reports), (U)," Project 7859, SRI International, Menlo Park, CA, (4/85), SECRET. 155. Puthoff, H., Humphrey, B.S., May, E.C., "Final Report "An Automated RV Evaluation Procedure" (Covering the Period October 1983 to October 1984), (U)," Project 7408, SRI International, Menlo Park, CA, (5/85), SECRET 156. May, E.C., Hubbard, S.G., "Final Report "Photon Production" (Chinese Replication), (Covering the Period October 1983 to October 1984), (U)," Project 7408, SRI International, Menlo Park, CA, (5/85), SECRET 157. May, E.C., Humphrey, B.S., Puthoff, H., Hubbard, S.G. I -IMay I and SG1A 2,1985 (U)," Project 7408, SRI International, Menlo Park, CA, (6/85), SECRE F 158. May, E.C., "Proposal ESU 84-246 (Amendment to Rev-2), - Enhanced Human Performance Investigations (U)," Project 7408, SRI International, Menlo Park, CA, (9/85), SECRET. 159. May, E.C., "Approved PDC for Originals of Viewgrapgh Material & Illustrations (U)," Project 1291) SRI International, Menlo Park, CA, (11/85), SECRET. 160. Radin, D.I., May, E.C., Thomson, M., "Psi Experiments with Random Number Generators: Meta- analysis part 1," Proceedings of Presented Papers, The Parapsychological Association 28th Annual Convention, Mifts University, Medford, MA, pp 199-234, (August 1985), UNCLASSIFIED. 161. May, E.C., Radin, D.I., Hubbard, G.S., Humphrey, B.S., Utts, J.M., "Psi Experiments with Random Number Generators: An Informational Model" Proceedings of Presented Papers, The Approved For Release 2003/04/18: CIA-RDP96-00791ROO0200280001-6 139 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) Parapsychological Association 28th Annual Convention, Mifts University, Medford, MA, pp. 235-266, (August 1985), UNCLASSIFIED. 162. May, E.C., Humphrey, B.S., Thomson, M., "A Figure of Merit Analysis for Free-Response Material," Proceedings of Presented Papers, The Parapsychological Association 28th Annual Convention, Tufts University, Medofrd, MA pp 343-354, (August 1985), UNCLASSIFIED. 163. Hubbard, G.S., May E.C., Puthoff, H.E., "Possible Production of Photons During a Remote Viewing Task: Preliminary Results," Proceedings of Presented Papers. The Parapsychological Assoication 28th Annual Convention, Tufts University, Medford, MA, pp. 335-372, (August 1985), UNCLASSIFIED. 164. Utts, J.M., May, E.C., "An Exact Method for Combining P- Values," Proceedings of Presented Papers. The Parapsychological Association 28th Annual Convention, Tufts University, Medford, MA, pp.431-439 (August 1985), UNCLASSIFIED. 165. May, E. C., Utts, J. M., Radin, D. I., Hubbard, G.S., Humphrey, B. S., "Sensor Disruption Models," SRI International, Menlo Park, CA, Final Report, (October 1985), UNCLASSIFIED. 166. May, E. C., "Enhanced Human Performance Investigations," (A 5 -Year Program Proposal, Th Begin in Fiscal Year 1985), SRI International, Menlo Park, CA, Proposal for Research, ESU 84-246 (Amendment to Rev. 2), SRI/GF-0281, (September 1985), UNCLASSIFIED. 167. May, E. C., Humphrey, E. S., Puthoff, H. E., "Automated RV Evaluation Procedure," SRI International, Menlo Park, CA, Final Report, Project 7408-12, SRI/GF-0276, (May 1985), UNCLASSIFIED. 168. Hubbard, G.S., (Consultant), May, E. C., "Photon Production," SRI International, Menlo Park, CA, Final Report, Project 7408-10, SRI/GF-0276, (May 1985), UNCLASSIFIED. 169. Humphrey, B. S., May, E. C., "Bacterial -Mutation Study," SRI International, Menlo Park, CA, Final Report, Project 7408- 10, SRI/GF-0277, (May 1985), UNCLASSIFIED. 170. Puthoff, H. E., May, E. C., "Enhanced Human Performance," (A 5- Year Program Proposal to Begin in Fiscal Year 1985), SRI International, Menlo Park, CA, Proposal for Research, Proposal Number ESU 84-246, SRI/GF-0273, (April 1985), UNCLASSIFIED. 171. Puthoff, H. E., May, E. C., "Psychoenergetics program (FY 85)" SRI International, Menlo Park, CA, Proposal for Research, Proposal Number ESU 84246, SRI/GF-0271, (January 1985), UNCLASSIFIED. 11. 1986 172. Hubbard, G.S., Langford, "D-1, RVTraining Final Report (U)," Project 1291, SRI International, Menlo Park, CA, (12/86), SECRET. 173. May, E.C., Hubbard, G.S., "E-1, Interim Report (PMT), (U)," Project 1291, SRI International, Menlo Park, CA, (12/86), SECRET 174. May, E.C., Lantz, N.D., " E-2, Interim Report (Search Interim), (U)," Project 1291, SRI International, Menlo Park, CA, (12/86), SECRET. 175. May, E.C., "Quarterly Report 4 - Enhanced Human Performance Investigation (U)," Project 1291, SRI International, Menlo Park, CA, (12/86), SECRET 176. Humphrey, B.S., Lantz, N.D., "C-2, Final Report Screening and Selection of Personnel: The Personality Assessment System (PAS), (U)," Project 1291, SRI International, Menlo Park, CA, (12/86), SECRET. - 177. May, E.C., "Annual Administrative Report (U)," Project 1291, SRI International, Menlo Park, CA, (12/86), SECRET Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B10 Approved For Release 2003/04/18 : CIA-RDP96-00791ROO0200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 178. Humphrey, B.S., "A-4, Remote Viewing Evaluation Techniques (U)," Project 1291, SRI International, Menlo Park, CA, (12/86), SECRET 179. May, E.C., "Quarterly Report 3 - Enhanced Human Performance Investigation 4/1/86 - 6/30/86 (U)," Project 1291, SRI International, Menlo Park, CA, (8/86), SECRET 180. May, E.C., "Mid-Year Administration Report 1, May, 1986 - Enhanced Human Performance Investigation (U)," Project 1291, SRI International, Menlo Park, CA, (5/86), SECRET 181. May, E.C., "Quarterly Report 2 - Enhanced Human Performance Investigation (U)," Project 1291, SRI International, Menlo Park, CA, (5186), SECRET 182. May, E.C., "Interim Report - Deliverable 1 - Objective A, Task 1 - Phase 1 Protocols and Research Design Guidelines (U)," Project 1291, SRI International, Menlo Park, CA, (4/86), SECRET 183. May, E.C., "Quarterly Report 1 - Enhanced Human Performance Investigation (U)," Project 1291, SRI International, Menlo Park, CA, (5/86), SECRET. 184. Hubbard, G.S., May, E.C., "Aspects of Measurement and Applications of Geornatic Indices and Extremely Low Frequency Electromagnetic Radiation for use in Parapsychology," Proceedings of Presented Papers, The Parapsyological Association 29th Annual Convention, Sonoma State University, Rohnert Park, California, pp. 519-536, (August 1986), UNCLASSIFIED. 185. Hubbard, G.S., May, E. C., "An Experiment to Explore Possible Anomalistic Behavior of a Photon Detection System During a Remote Viewing Test," SRI International, Menlo Park, CA, Interim Report, Project 1291, SRI/GF-0296, (December 1986), UNCLASSIFIED. 186. Humphrey, B. S., Rask, V. V., May, E. C., Thomson, M. J., "Remoter Viewing Evaluation Techniques," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF-0291, (December 1986), UNCLASSIFIED. 187. Lantz, N. D. May, E. C., "Location of Target Material in Space and Time," SRI International, Menlo Park, CA, Interim Report, Project 1291, SRI/GF-0295, (December 1986), UNCLASSIFIED. 188. May, E. C., Humphrey, B. S., SRI International, Pleass, C. M., University of Delaware, "Measuring Remote Action Influence on the Vertical Component of dunaliella Velocity," SRI International, Menlo Park, CA, Interim Report, Project 1291, (December 1986), UNCLASSIFIED. 189. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Final nchnical Report, Project 1291, SRI/GF-0294, (December 1986), UNCLASSIFIED. 190. May, E. C., "Remote Action Hardware Construction: A Quantum Mechanical Photon Experiment," SRI International, Menlo Park, CA, Final Report, Project 1291, (December 1986), UNCLASSIFIED. 191. May, E. C., "Intuitive Data Sorting: An Informational Model of Psychoenergetic Functioning," SRI International, Menlo Park, CA, Final Report, Project 1291, (December 1986), UNCLASSIFIED. 192. Piantanida, T, Lantz, N.D., May, E. C., "A Remote Viewing Feedback Dependency Experiment," SRI International, Menlo Park, CA, Interim Report, (December 1986), UNCLASSIFIED. 193. May, E. C. Humphrey, B. S., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Quarterly Report 3, SRI/GF-0290, (August 1986), UNCLASSIFIED. 194. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Quarterly Report 2, Project 1291, SRI/GF-0287, (May 1986), UNCLASSIFIED. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B11 , Approved For Release 2003/04/18 : $,A-RDP96-0PJ,91 R000200280001-6 A 5-Year Program Plan lor Anomalous Mental henome 195. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Mid-Year Administration Report 1, Project 1291, SRI/GF-0288, (May 1986), UNCLASSIFIED. 196. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Quarterly Report 1, Project 1291, SRI/GF-0285, (April 1986), UNCLASSIFIED. 197. May, E. C., "Objective A, Thsk 1-Phase 1 Protocols and Research Design Guidelines," SRI International, Menlo Park, CA, Interim Report, Project 1291, SRI/GF-0286, (April 1986), UNCLASSIFIED. 198. May, E. C., "Objective B, Task I - Parapsychology Sources of Information Center (PSIC)," SRI International, Menlo Park, CA, Sub - contract B-76755, (April 1986), UNCLASSIFIED. 199. Hubbard, G.S., Braud, WW, "An Experiment to Test Apparent Remote Action (RA), Effects on Electrodermal Activity," SRI International, Menlo Park, CA (12/86), UNCLASSIFIED. 200. Hubbard, G.S., Issacs, J.D., "An Experiment to Examine the Possible Existence of Remote Action Effects in Piezoelectric Strain Gauges," SRI International, Menlo Park, CA (12/86), UNCLASSIFIED. 201. Hubbard, G.S., Storm, E., "A RNG Experiment to Rst the Effects of Source and Distance, "SRI International, Menlo Park, CA (12/86), UNCLASSIFIED. 202. Hubbard, G.S., White, R.A., "A Resource Library for Parapsychological Literature and Related Disciplines," SRI International, Menlo Park, CA (12/86), UNCLASSIFIED. 203. Lantz, N.D., Kiermam, R.J., "Neuropsychological Assessment of Participants in Psychoenergetic Ihsks," SRI International, Menlo Park, CA (1V86), UNCLASSIFIED. 12. 1987 204. May, E.C., "Administrative Final Report (1987), (U)," Project 1291, SRI International, Menlo Park, CA, (12/87), SECRET. 205. May, E.C., "Final Technical Report - Enhanced Human Performance Investigation (U)," Project 1291, SRI International, Menlo Park, CA, (12/87), SECRET 206. Utts, J.M., "G and D-1, Computer Search and Dowsing (U)," Project 1291, SRI International, Menlo Park, CA, (12/87), SECRET 207. May, E.C., "F1 -a and 1b, RT vs Precig: Thch (U)," Project 1291, SRI International, Menlo Park, CA, (12/87), SECRET. 208. May, E.C., Hubbard, G.S., Frivold, TJ., "Objective E, Task 1, Final Report (1/10/85 - 9/30/87), (U)," Project 1291, SRI International, Menlo Park, CA, (12/87), SECRET. 209. May, E.C., Humphrey, B.S., Hubbard, G.S., Lantz, N.D., Rask, VX, "Mid-Year Technical Report, October 1, 1986 -March 31, 1987 (U)," Project 1291, SRI International, Menlo Park, CA, (4/87), SECRET. 210. May, E.C., "The Cognitive Sciences Program: An Overview (1972-1987), (U)," Project 1291, SRI International, Menlo Park, CA, (3/87), SECRET. 211. McNelis, R, "T'he Enhanced Human Performance Project: An Assessment of the Effort to Date, Project Review Group, 14 April 87 (U)," HQ, USAMRDC, Frederick, MD, (4/87), Project 1291, SECRET 212. Hubbard, G.S., May. E. C., Frivold, I J., "Possible Photon Production During a Remote Viewing Thsk: A Replication Experiment," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF-0302, (December 1987), UNCLASSIFIED. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B12 Approved For Release 2003/04/18 : CIA-RDP96- 791ROO0200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena A 213. Humphrey, B. S., Frivold, T J., May, E. C., Luke, W W, Utts, J. M., Trask, V V, "Fuzzy Set Applications In Remoter Viewing Analysis," SRI International, Menlo Park, CA, Final Report, Project 12891, (December 1987), UNCLASSIFIED. 214. May, E. C., Lantz, N.D., "Feedback and Precognition Dependent Remote Viewing Experiments," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF-0304, (December 1987), UNCLASSIFIED. 215. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Final Technical Report, Project 1291, SRI/GF-0308, (December 1987), UNCLASSIFIED. 216. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Annua'A Administrative Report, Project 1291, SRI/GF-0309, (December 1987), UNCLASSIFIED. 217. May, E. C., Spottiswoode, S. J. P, (Consultant), Piantanida, T, SRI International, Walker, E. H., U.S. Army Ballistic Research Laboratory, "A Quantum Measurement Experiment With a Single Photon Interferometer," SRI International, Menlo Park, CA, Final Report, (December 1987), UNCLASSIFIED. 218. May, E. C., Pleass, C. M., "A Remote Action Investigation With Marine Animals," SRI International, Menlo Park, CA, Final Report, Project 1291, (December 1987), UNCLASSIFIED. 219. Utts, J. M., May, E. C., Frivold, T J., "Intuitive Data Sorting," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF, (June 1987), UNCLASSIFIED. 220. Utts, J. M., Lantz, N. D., May, E. C., Humphrey, B. S., "Computer- Assisted Search," SRI International, Menlo Park, CA, Final Report, Project 1291, SRVGF-0305, (December 1987), UNCLASSIFIED. 221. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Mid-Year Report, Project 1291, SRI/GF, (June 1987), UNCLASSIFIED. 222. May, E. C., "The Cognitive Sciences Program: An Overview (1972- 1987), UNCLASSIFIED." SRI International, Menlo Park, CA, Project 1291, SRI/GF - 0298, (February 1987), UNCLASSIFIED. 223. Hubbard, G.S., "The SRI International Cognitive Science Conference at Princeton University," (topic: " What constitutes proof of a controversial claim?"), SRI International, Menlo Park, CA, (12/87), UNCLASSIFIED. 224. Hubbard, G.S., Bentley, P.R, Pasture], P.K., Issacs, J.D., et. al., "A Remote Action Experiment with a Piezoelectricftansducer," SRI International, Menlo Park, CA (12/87), UNCLASSIFIED. 225. Hubbard, G.S., Utts, J.M., Braud, W, Experimental Protocol for Hemolysis: Confirmation Experiment," SRI International, Menlo Park, CA (12/87), UNCLASSIFIED. 226. Lantz, N.D., "Review of Personality Assessment System," SRI International, Menlo Park, CA (12/87), UNCLASSIFIED. 13. 1988 227. May, E.C., Humphrey, B.S., "1988 Objective F, Thsk 1 - Fuzzy Set Final "Applications of Fuzzy Sets to Remote Viewing Analysis (U)," Project 1291, SRI International, Menlo Park, CA, (12/88), SECRET 228. May, E.C., "FY 1988 Final Admin Report (U)," Project 1291, SRI International, Menlo Park, CA, (12/88), SECRET. 229. May, E.C., "LANL-MEG Report (U)," Project 1291, SRI International, Menlo Park, CA, (12/88), SECRET. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B13 Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 A 5-Year Program Plan for Anomalous Mental Phenomena (U) 230. Lantz, N.D., "FY 1988 - The Effects of Hypnosis on Remote Viewing Quality (U)," Project 1291, SRI International, Menlo Park, CA, (12/88), SECRET. 231. Utts, J.M., "FY 1988, El and E2 Feedback Report "Feedback and Thrget Dependencies in Remote Viewing Experiments (U)," Project 1291, SRI International, Menlo Park, CA, (12/88), SECRET 232. May, E.C., "FY 1988 Final Technical Report (A-3), (U)," Project 1291, SRI International, Menlo Park, CA, (12/88), SECRET. 233. May, E.C., "Objective E, Task 4 - FY 1988 Analytic Report "Forced- Choice Remote Viewing (U)," Project 1291, SRI International, Menlo Park, CA, (12/88), SECRET. 234. May, E.C., "1988 Mid-Year Technical Final (U)," Project 1291, SRI International, Menlo Park, CA, (6/88), SECRET 235. May, E.C., "Enhanced Human Performance Investigations Final Report (U)," Project 7408, SRI International, Menlo Park, CA, (12/88), SECRET. 236. Walker, E.H. May, E.C., Spottiswoode, S.J.P., Piantanida, T, "Testing Schrodinger's Paradox with a Michelson Interferometer," Physica B, 151 (1988), 339 UNCLASSIFIED. 237. Humphrey, B.S., May, E.C., Utts, J.M., "Fuzzy Set T&hnology in the Analysis of Remote Viewing," Proceedings of Presented Papers, The Parapsychological Association 31st Annual Convention, Montreal, Quebec, Canada, (August 1988), UNCLASSIFIED. 238. May, E.C., Spottiswoode, S.J.R, "A Michelson Interferometer Schrodinger Cat: The Death of the Observation Theories," Proceedings of Presented Papers, The Parapsychological Association 31st Annual Convention, Montreal, Quebec, Canada, (August 1988), UNCLASSIFIED. 239. May, E.C., Lantz, N.D., "Rchnology: A Mixed Blessing for Modern PSI Research," Proceedings of the Parasychology Foundation Annual Meeting- 1988, (June 1988), UNCLASSIFIED. 240. Humphrey, B. S., May, E. C., Utts, J.M., "Fuzzy Set Technology in the Analysis of Remote Viewing," SRI International, Menlo Park, CA, Project 1291, (December 1988), UNCLASSIFIED. 241. Lantz, N.D., May, E. C., "Mass Screening for Psychoenergetic Thlent Using a Remote Viewing Task," SRI International, Menlo Park, CA, Final Report, Project 1291, (December 1988), UNCLASSIFIED. 242. May, E. C., "Enhanced Human Performance Investigations," SRI International, Menlo Park, CA, Final Report, SRI/GF-0284a, (December 1988), UNCLASSIFIED. 243. May, E. C., Tkask, V V., "Forced-Choice Remote Viewing," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF- 0321, (December 1988), UNCLASSIFIED. 244. May, E. C., "Enhanced Human Performance Investigation," Final Technical Report, SRI International, Menlo Park, CA, Project 1291, SRI-GF-0313, (December 1988), UNCLASSIFIED. 245. May, E. C., Luke, W W, Frivold, T J., "Neurophysiological Correlates to Remote Viewing," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF-0316, (December 1988), UNCLASSIFIED. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Annual Administrative Report, Project 1291, SRI/GF-0317, (December 1988), UNCLASSIFIED. 246. May, E. C., Frivold, T J., Humphrey, B. S., Utts, J. M., "Application of Fuzzy Sets to Remote Viewing Analysis," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF- 0318, (December 1988), UNCLASSIFIED. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B14 Approved For Release 2003/04/18 :P%IA-RDP96-00791ROO0200280001-6 A 5-Year Program Plan for Anomalous Mental enomena (U) 247. May, E. C., SRI International, Honorton, C., Ferrari, D.B., Hansen, G., Psychophysical Research Laboratories, "Meta-Analysis of Forced-Choice Precognition Experiments," SRI International, Menlo Park, CA, Final Report, Project 1291, (December 1988), UNCLASSIFIED. 248. Walker, E. H., U. S. Army Ballistic Research Laboratory, May, E. D., Spottiswoode, S. J. P, Piantanida, T, "T@,sting Schrodinger's Paradox With a Michelson Interferometer," SRI International, Menlo Park, CA, (September 1988), UNCLASSIFIED. 249. May, E. C., "Enhanced Human Performance Investigation," SRI International, Menlo Park, CA, Mid-Year Technical Report, Project 1291, SRI/GF-0310, (June 1988), UNCLASSIFIED. 250. May, E. C., "Meta-Analysis of Precognition Research From 1935 to 1987," SRI International, Menlo Park, CA, Interim Report, Project 1291, (April 1988), UNCLASSIFIED. 251. May, E.C., "Psychoenergic Program Review (1972-1989), (U)," Project 1291, SRI International, Menlo Park, CA, (4/89), SECRET 252. May, E.C., "Memo for Declassification of Project 1291 (U)," Project 1291, SRI International, Menlo Park, CA, (6/89), SECRET. 253. May, E.C., "Remote Viewing of Function a Prototype Analysis System for Special Remote Viewing Tbsks (U)," Project 1291, SRI International, Menlo Park, CA, (10/89), SECRET. 254. May, E.C., "Remote Viewing Analysis of Function A Prototype Analysis System For Special Remote Viewing Thsks (U)," Project 1291, SRI International, Menlo Park, CA, (10/89), SECRET. 255. May, E.C., "FY 1989 Final Report (6.0.1), Meta Analysis (U)," Project 1291, SRI International, Menlo Park, CA, (3/89), SECRET SG1J 256. Government -Sponsored Research in Psychoenegetics (U)," DIA, Washington, DC, (2/89), Project 1291, SECRET 257. May, E.C., "Admin-Final, Thsk 6.0.4 (U)," Project 1291, SRI International, Menlo Park, CA, (12/89), SECRET. 258. May, E.C., "A Suggested Program for Enhanced Data Acquisition (U)," Project 1291, SRI International, Menlo Park, CA, (4/89), SECRET 259. May, E.C., "Psychoenergic Program Review (1972-1989), (U), Project 1291, SRI International, Menlo Park, CA, (4/89), SECRET. 260. Luke, W W, Frivold, I J., May, E. C., 'Rask, V V, "A Prototype Analysis System for Special Remote Viewing Thsks," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF- 0321, (December 1989), UNCLASSIFIED. 261. May, E. C., Luke, W, W, Tkask, V. V., Frivold, I J., "Observation of Neuromagnetic Fields in Response to Remote Stimuli," SRI International, Menlo Park, CA, Final Report, Project 1291, (December 1989), UNCLASSIFIED. 262. Mask, V. V, Lantz, N. D., Luke, W W, May, E. C., "Screening for Remote Viewing Ulent," SRI International, Menlo Park, CA, Final Report, Project 1291, (December 1989), UNCLASSIFIED. 263. May, E. C., Utts, J. M., aask, V V, Luke, W W, Frivol d, T J., Humphrey, B. S., "Review of the Psychoenergetic Research Conducted at SRI International (1973-1988)," SRI International, Menlo Park, CA, Final Report, Project 1291, SRI/GF-0320, (March 1989), UNCLASSIFIED. 14. 1990 264. May, E.C., "Program Description Requirements (U)," Project 1291, SRI International, Menlo Park, CA, (4/90), SECRET Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B15 roved ForRekenaosmea3003/04/18 : CIA-RDP96-00791ROO0200280001-6 A 5-YeaApr9grarn P an or ous Mental Phenomena (U) 265. May, E.C., Utts, J.M., Humphrey, B.S., Luke, WW, Frivold, TJ., 'ftask, W, 'Advances in Remote Viewing Analysis," Journal of Parapsychology, Vol. 54, (September, 1990), UNCLASSIFIED. 266. May, E. C., Luke, W W, Trask, V V, Frivold, T J., "Observation of Neuromagnetic Fields in Response to Remote Stimuli," The Proceedings of the Presented Papers of the Parapsychological Association 33rdAnnual Convention, National 4-H Center, Chevy Chase, MD, (August, 1990) UNCLASSIFIED. Approved For Release 2003/04/18 : CIA-RDP96-00791 R000200280001-6 B16