Approved For Releas IIA-RDP96-00788ROO0500030014-0 "I IA-RDP Interim verbal report to Project 8035 analyst, 10 October 1980. Target was the thirt$GlAthe ided telephonically. 1i t 0 v Geo coordinates wer Following is gist of the description provided: a. A column of fire going straight up. b. A desolate, but rolling area with the ground opening into a mound. C. Several large holes over a wide area, four or five. d. Slight border of green on the left. e. A metal domed shape like 'an old hangar, made of metal. f. Approximately four very heavy fork lift type vehicles working inside the hangar-type building. g. Looked like a big storage area for huge pipes V-4' in diameter. h. Feeling that what was being looked for was already gone. Directed=to go back in time and look for that which was being sought. a. A rocket vehicle of some sort, the ground. b. Time of acquisition of target: to 09 October 1980. poised to take off, in approximately 12 days prior Directed to return to the warehouse/hangar type building and present time. a. Same large cylinders, feeling of maintenance. b. Move to 12 Oct 80 - large cylinder gone. C. 15 Oct working on something smaller. d. 18 Oct assembly of a front portion to the main portion. e. 18 Oct feeling of final assembly. There are three section to the""thing" f. The front is the "carrier", the center is the power source, the tail, is the fuel, having almost a "needle" nose cone, which later appeared more rounded. Directed to follow the device forward in time. a. Device rolled out of warehouse oil several carriers to the field. (no appreciation for distance) b. No people going on it. C. Research, picture taking. d. Time to launch from the last day of future (18 Oct 80) * 2 days for movement ( O/A 20 Oct 80) * 2-3 days for launch (0/A 22 - 23 Oct 80) NOTE: Activity level was most intense during the period in which the three section were being assembled, circa 18 Oct 80. ~ "nimnrl Approved For Release 2000/0,21 NICIN x'ur aw- 078