Approved For Release 2000/0 96-00789ROO0400240004-8 DEFENSE INTELLIGENCE AGENCY WASHINGI ON. D.C. 20301-6111 DT-S 11 Aug 88 MEMORANDUM FOR DEPUTY DIRECTOR FOR SCIENTIFIC AND TECHNICAL RESEARCH SU13JECT: SUN STREAK Operational Report - 8809 (U) 1. (SINFISK) During the period of 16 June 1988 to 26 July 1988 inclusively, four remote viewers conducted a total of eleven sessions in an effort to describe the principal function and SG1A activities related to the target site identified as Results of this effort follow substantially below. 2. (S/NF/SK) Viewer 095 perceived the target site of interest as being subject to construction in two separate phases. The first phase of construction is projected for completion within a two-year period. The second hpase of construction was not accessed by 095. Viewer 095:described the principal target structure as being a square, high buildiny of block construction. Black, shiny, smooth objects "capable of being armed and directed (aimed)" were observed within the target, structure. The concept of "roll-out" was associated with the objects and the structure. Conduits were observed running above and below ground; in fact, the site (structure) itself appeared to be constructed partially underground. The site appeared to serve a twofold purpose: the first involved the testing of, a large and stationary object in a massive room filled wi Ith equi'pment that served as a source of power described as concentrated, contained, energy; while the second stage involved the ultimate assembly, direction, and aiming of a system. System completion appeared dependent upon a meticulously detailed process of assembly, a process of integration normally associated with a "mobile nuclear system." Additional concepts of compleixity, density, mass, length, and roll-out were associated with! the overall process. The target Isite was military related and, shielded from access by the implementation of stringent security measures. The objects under I WARNING NOTICE: SENSITIVE INTELLIGENCE SOURCES AND METHODS INVOLVED HANDLE VIA SKEET CHANNELS ONLY SPECIAL ACCESS REQUIRED CLASSIFIED BY: DT, DIA DECLASSIFY BY: OADR Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0400240004-8 1, r~ 6 C Approved For Release 2000/08/OTT nA, 496-00789ROO0400240004-8 construction were described as bigt longt large structures that measured an estimated twenty-five feet in length. See ENCLOSURE 1. The duality of distinct, yet functionally related procedures, persisted throughout 095's viewing efforts. 3. (S/NF/SK) Viewer 079 identified Target Site M as a nuclear SG1A reproduction facility located in an isolated area in the southern portion of the Soviet Union. The target site served as a vast technical nuclear research and dissemination "system" (center). The study of electro-optics was pursued at the site. Such concepts as "software/hardware," $splicing needles," and "radiation" described the functional pertinence of the tat-get site. Current, advanced studies related to "telemetry" were being pursued; results of this effort will reportedly make contemporary, state-of-the-art methods in telemetry obsolescent. An estimated 6,000 personnel are employed at the facility. For the most part, it is headed by a cadre of military technicians and physicists. SG1A Viewer 079 perceived Target ~ as being the object of unfavorable publicity and criticism in the future. The Soviets SG1A are also developing the equivalent of a US AWAC capability at Target Site~~ There appear to be ongoing efforts dedicated to the development of "telescopic radiation" involving the study of "minute particles in a highly complex manner." The US SG1A counterpart to Target Site is a facility named "Gardner/Garner" (Goddard?). The principal target buildings are wide, tall, square and markedly clean. The presence of huge windows allowed for a high degree of light infiltration into the target buildings. 4. (SINFISK) Viewer 018 associated Target Site Mwith the SG1A concepts of research, testing, and "junk storageM." Target structures of related interest were described as a series of three buildings (ENCLOSURE 2) functionally associated with a tall, triangular antenna that appeared related to command and control activity. 5. (S/NF/SK) Viewer 0 11 perceived Target Site llllllllllllllllllas a huge, SG1A massive, tall windowless structure constructed of thick, reinforced concrete with a single access entrance and a single exit. The target structure appeared surrounded by an open, paved area secured by a double security fence and floodlights. See ENCLOSURE 3. The target site appeared functionally oriented towards command and control and state-of-the-art tracking of space objects. Information was decoded (at the target site). analyzed, compiled, and subsequently stored. Some data was retransmitted to other receiving stations for further analysis (as in NORAD or from an NSA site). n r, ~ %, L Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0400240004-8 - Approved For Release 2000/0 1 P96-00789ROO0400240004-8 6. (S/NF/SK) COMMENTS: Additional details of information contained in session transcripts and viewer summaries can be made available upon request. They are too lengthy for inclusion with .this report. Customer comments, suggestions or additional project-related tasking are welcomed. SG1J 1 ENCLOSURE DRAWING GG-14 Branch Chief Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0400240004-8