Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0500190009-8 f::'R(-.QECT E3)UN STREAK AND ME"I'l I IA VI... V I:.:.. D -- - --- --- --- -- ---------------- -------- --------- . ..... SESSION NUMBER. "'? DATE OF SESSION: ~':,)TART- 0750 METHODOLOGY-. SOLO . . ... . ..... . . . ..... .. . ..... .... .... .. . ........ DATE OF REPORT: END: 0 (,:3 VIEWER IDENTIFIER: 018 I NF MISSION. Dei:icrilnc.-.-~ t1--ie mc);,:;;t t-tnique ai.7,j::)ect anc: c)f t-hie ti-i--m-get 4.5i't--e aric-1 provicie ;,.-xn aver-hei-i-mJ c:J -[.ar-get area. 2. (S/NF--/St) VIEWER TASKING: to viewer- to take thc--.-~ c)ver-1--ic.-,)i,,mJ sketc:J-i +r-tnfn 1--iii:i 1::)r-evicm.ts sessic)ri ar)d j::)r-c:)be it to if 1--ie c)tvtain more COMMENTS: ('1J3 ot mutch fnor,e f3vel-1--iezic] Tri additiori, 1--ie cflnta-inecl ;.-,tcJdj.tic:)r1a1 s:~inec-.J.f-ic abOUt ti"ie at the isite. 4. EVALUATION: I1AND1 f.:. VIA CHANNE-H 9 ONLY .......... (,I A IACCE.SS REQUIRED OFORN CLASSIFIED BY: DIA (DT) DECLASSIFY ON: OADR Approved For Release 200W08/08 CIA-RDP96-00789ROO0500190009-8 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0500190009-8 WORKING PAPER Project: 89__ Date: 890419 Viewer: 018 Session; 02 SUMMARY OF INFORMATION: 1. A stage 6 probe map was made of the target area (see page iA). The following impressions were derived from the probe map: a. (#I on the probe map) This point was marked as the target coordinates and used as a beginning probe point for the probe map. b. (#2 an the probe map) A paved "walkway" which traverses the entire site area. C. (#3 on the probe map) A grey structure located parallel to the walkway. There were no impressions inside this structure that it held any EEI. d. (#4 on the probe map) A "ramp" area which is a part of the grey structure. A person was seen using this "ramp" to enter the building. e. (#5 on the probe map) A Curved offshoot to the major walkway (see I.b. , above) which appears to angle back toward the grey structure. f. (#6 on the probe map) There was an impression here of a girl in a yellow spring-+ashion dress standing at a sales counter, evidently buying something. This impression, though completely out of place with the target site, was very strong. 9. (#7 an the probe map) The building where the material described in the previous session is manufactured. This is a large, square, flat, grey building. It gives the impression of being more modern in design, and the feeling an the interior was that of actual work and implementation being HANDLE VIA SKEET CHANNELS ONLY dwWWROPOW Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0500190009-8 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0500190009-8 done. h. (#8 on the probe map) The building where the person (the Director) described in the last session normally works. This is a red brick building with large white "trim" and a somewhat ornate top. It gives a feeling of "old, elegant, and distinguished" (see also, I.m., below). i. (#9 on the probe map) A large, circular paved area of the "walkway" which has a circle of benches in the middle. There was no impression of plants or other decorations here. j. (#10 on the probe map) A large hole in the ground; evidently a part of a construction site. k. W11 on the probe map) A building under construction. It is to be a tall (multi-storied) and slender building, but is presently at the stage of girders only. M. (#12 on the probe map) A building which had the same appearance as described in I.h., above. These two buildings not only loot.. and "feel" alike, but also gave the impression of being the only two buildings viewed which are lined up in a row. All the other buildings were seen to be at odd angles to one another. This building did not contain any impressions of being of EEI value. 2. At the end of the session, the probe map was traced onto a clean sheet to form an overhead map (see page 7) for reporting purposes. HANDLE VIA SK'EET CHANNELS ONLY damew-W Approved For Release 2000/08/08 : CIA-RDP96-00789ROO0500190009-8