Approved For Release 2003/04/18 : CIA-RDP96-00789ROO3000200006-1 STATEMENT OF WM@X FUR PHENCHENOLOGICAL RESEARCH AND ANALYSIS 1.0 (sftw) PuRpom The purpose of this effort is to perform assessments of select aspects and foreign developments in anomalous phenomena. 2.0 (U) BACKGROUND: 2.1 (C) The assessment effort in this contract modification addresses recent foreign achievements in information aspects of, anomalous Phenomena. It also includes efforts to review/simulate recent developments to aid in effectiveness evaluation. 2.2 (U) This effort is follow on to a activity initiated in a recent purchase request (PR 330/026Z/92) and the resulting contract (MDA 93-C-0004) that SG1B was awarded to SAIC for this overall phenomenological investigation/assessment effort. 3.0 (U) OBJECTTVE: The objective of this modification is to expand assessment effort in this phenomenological area and to evaluate new foreign data. 4.0 (U) SOOPE: Recent foreign data assessment and effectiveness evaluation will be accomplished for this phenomenological area. 5. 0 (U) TECHNICAL/OTHER CONSIDE[RATIONS: 5.1 (SINF) All efforts and findings resulting from previous programs in psychoenergetics shall be brought to bear on this effort. In addition, expertise in multidisciplinary areas shall be made available as consultants or for special support as required. Classified By: DIA/PAG-TA Declassify On: OADR SECREr/NOFORN Enclosure 3 Approved For Release 2003/04/18 : CIA-RDP96-00789ROO3000200006-1 Approved For Release 2003/04/18 : CIA-RDP96-00789ROO3000200006-1 5.2 (U) Specialized support, if not available at the contractor facility, can be obtained via consultant or subcontract efforts with prior approval by the com. Every effort should be made to insure such support is from the recognized experts in the field. Some of the effort in section 6.0 can be performed in unclassified facilities. 5.3 (SINF) Some of the activities in this effort may require participation of select government personnel. All such investigations will be fully planned and coordinated with the COIR and will be under the purviews of appropriate review committees. 5.4 (U) Should unforseen schedule of other issues arise concerning any of the specific tasks identified in section 6.0, the COIR will be given immediate notice. If necessary, adjustments to priorities and schedules can be approved by the CDTR if there is no cost or other impact on the over-all program. The OCYIR will also review/approve all procedures where appropriate. 5.5 (U) All items in sections 6.0 and 7.0 will be funded from RDT&E funding provided by this contract. Accounting procedures to clearly identify the RDT&E oqDenditures shall be implemented by the contractor. 5.6 (U) Terms of reference are on file by the COM and will be provided to the contractor to insure adequate task understanding. This material is contained in DIA publication Dr-S-1007-S, 29 NOV 1990. 6. 0 (U) SPB=C MSKS: 6.1 (U) Assessment and Support: SG1 B 6.1.1 (U) Evaluation of data/effectiveness (follow-on to SOW 6.3.3 and 6.3.5 in PR 330/026Z/92). 6.1.1.2 (SINF) In accordance with SOW 6.3.5, provide evaluation and risk assessment of the data collected in SOW 6.3.5 in PR 330/026Z/92 and 6.1.1 above. Where possible, use modeling and/or simulation techniques or, in specific cases, condtct experiments with the goal of verification and risk assessment of original foreign efforts. 2 Approved For Release 2003/04/18 : CIA-RDP96-00789ROO3000200006-1 Approved For Release 2003/04/18 : CIA-RDP96-00789ROO3000200006-1 7. 0 (U) QUICK REACrJON CApABE= (QRc) : The contractor will maintain a quick response capability and be prepared to respond in less than 24 hours to problems or unexpected demands for brief technical papers that may be developed during the term of this project. 8. 0 (U) ALLOCATION OF MUM The level of effort to be applied to each basic task category is shown in the following paragraphs. 8.1 (U) RDME: Basic Task No. Allocation of Effort/ % Fundincf 75 6.1.1.2 25 Approved For Release 2003/04/18 : CIA-RDP96-00789ROO3000200006-1