Approved For Release 200o4/661: 'dWk6PW-WMR001600520005-4 IAGP-C-G 19 November 1982 MEMORANDUM FOR ADCSOPS-HUMINT SUBJECT: Status of Project CENTER LANE (U) 1. (C) Project CENTER LANE remains non-operational pending resolution of -the space problem. 2. (U) In a meeting with DCSOPS, DCSRM and DCSPER action officers on 18 Oct 82, a course of action was agreed upon which was basically as follows: a. DCSPER - Identify unfilled positions not in the NFIP. b. DCSOPS - Do an impact analysis and identify positions to which personnel could be asnigned. c. I would request required personnel actions. 3. (C) This procedure was followed for only 2 of the 5 required spaces. Subsequent to the.18 October meeting a determination was made by either DCSOPS or DCSPER ersonnel that ASD,would identify spaces to support SG1 B incumbent personnel. The action officer told me SG113 that this action had riot been coordinated with ASO, and could not be accomplished without writteri,direction from HQ INSCOM. 4. (C) In the last meeting with the DCSOPS action officer (17 Nov 82), SG1 B he restated that ASD is to Come UP with the 3 required spaces. The action officer and Mr Del Toro have continued to state that ASD only manages spaces provided to them and has no spaces of their own to support CENTER LANE. 5 (C) Pending identification of the final 3 spaces INSCOM cannot meet & Congressional direction for operation of Project CENTER LANE. zjaak;v~&_ ROBERT J. JACHIM LTC, MI Project Manager Approved For Release hhkWdQ IX-RIDP96-00788RO01 600520005-4 1 "1 H 4-1 4- 1 IN I If_VV_