Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 01111~110 PROJECT EVALUATION FEEDBACK PROJECT NO. 95-284-0 DATE OF PROJECT 22-24 Feb 95 SG1J The following is an evaluation form for the pro3ect you reviewed. Please complete this form and return tc Chief, Technology Assessment and Support Activity. A. Is the information accurate? (Circle response) Categories Source A Source B Source C Yes (true) May be true Possibly true No Possibly not true Unsure (1) (1) (1) (2) (2) (2) (3) (3) (3) (4) (4) (4) (5) (5) (5) (6) (6) (6) B. What is value of the Source(s)' information? (Circle response) Major significance (1) (1) (1) High value (2) (2) (2) Of value (3) (3) (3) Low value (4) (4) (4) No value (5) (5) (5) UNCLASSIFIED WHEN BLANK WNISR"r NOT RELEASABLE TO FOREIGN NATIONALS LIMITED DISSEMINATION Approved For Release 2000/08/08 : CIAO-T&$99%-%f89ROO2500060024-3 Enclosure 2 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 C. Rationale for source evaluation. Provide rationale/analysis which led to your evaluation of responses provided above. Include confirmatory/new confirmatory data and whether collection requirements are currently validated/tasked to either obtain or verify such data. Please provide your writ-ten evaluation by source. D. OFFICE/PHONE NUMBER NAME UNCLASSIFIED WHEN BLANK 019INW011180 NOT RELEASABLE TO FOREIGN NATIONALS LIMITED DISSEMINATIO14 Approved For Release 2000/08/08: ClA9-fflbk(9-W-A9R002500060024-3 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 SESSION INFORMATION A. TARGET DATA: Task/Target No. 95-284-0 session No. 01 B. PERSONNEL DATA: Source No. 049 C. SESSION DATA: Date Task Received Session Date Start Time End Time Method Used Distractions Pro-session Hunches (AVs): Date Summary Returned 22 Feb 95 02 Mar 95 1140 1250 CRV Sinus headache; music Military operation 02 Mar 95 D. EVALUATION DATA: Viewer's Estimate Evaluator's Estimate E. SESSION SUMMARY: Viewer's Note: I had an Advanced Visual (AV) of a Carrier Group exercise. The targeted scheduled activities revolve around a ship-based or naval-based exercise. My sense is that a new organization or unit will be involved. It will be a new operation for the country (ies) involved. The activity is def initely associated with water. The location of this operation is the northern Indian Ocean, probably the Arabian Sea area. It will take place in an area which is characteristically shallow and where the ocean surface is generally smooth. I really sense that the purpose of this activity is to test some new equipment, assets or technology. It has to do with launching or releasing a smaller vessel from beneath a larger one; the pursuit of, and eventual attachment of a small object onto, larger vessels by this smaller vessel; and the sense that when these larger vessels pass through a subsurface "beam" of sorts, this beam in turn triggers or otherwise affects the small object attached to the ship. other concepts include: 1) A winged-shaped object which feels as if it literally slides or slices between water molecules rather than "pushing" itself through the water. It appears "dark and sinister" and has a "stealthy" concept associated with it. It can travel in shallow water. Pointed and backward slanting projections angling up from its upper surface each produce a constant stream of bubbles. This Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 somehow is associated with its camouflaging capability and/or propulsion system. 2) A large vessel appears as if its entire bottom drops downs and opens up. It then discharges a smaller object or vessel, which in turn slides easily out of the larger vessel. This smaller vessel then slips in under larger vessels which it can pursue undetected. I sense that the numerous streams of bubbles help to facilitate this "anonymity". This smaller vessel can come and go as it pleases; it can approach any object and get away before detection. 3) There is an opening reminiscent of an "aperture" on one of the vessels involved. I sense that it functions as a combination coupling attachment/discharging device. Conceptually, it's as if it can attach to something large, stay attached while discharging a smaller object, this disengaging itself and escaping undetected. 4) (Viewer's Note: This one is really bizarre!!!) I sense a yellowish "beam" which occurs 151 to 201 below, and running parallel to, the water surface. It is a projected beam meant to be crossed and broken by the bow/hull of a ship. When the ship passes through this beam, the beam, in turn, triggers or otherwise affects a small object which had been attached to the ship at an earlier location. I sense that there is a great distance between the "attachment point" and the "triggering or affect point". 5) The concept of a "pyramid-based code" or a "stepped-based code" is associated with particularly the smaller, more agile object/vessel. Final Viewer's Note: Because of the bizarre nature of the data I perceived, I have a feeling that thetasking and/or this project is not completely clean. 2) Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 Approved For'Release 2000/08/08: CIA-RDP 96-00,789ROO2500060024-3 C-4) Approved FoWle'-ajse~2_000/08/08 CIA-RDP96-00789ROO2500060024-3 ATEK!"i Af L41E 0f%;rSeT- C,-A fri~ (f CL Approved For Release 2000/08/08 CIA-RDP96-00789ROO2500060024-3 6a Approved For Release 2000/08/08 CIA-RDP96-00789ROO2500060024-3 Approved For Release 2000/08/08 CIA-RDP96-00789ROO2500060024-3 SESSION INFORMATION A. TARGET DATA: Date: 22 Feb 95 Task/Target Number: 94-284-0 Session Number: 01 B. PERSONNEL DATA: Source Number: 079 Monitor Number: Beacon/Sender No.: C. SESSION DATA: Session Start Time: 1400 Session Stop Time: 1500 Method Used: Aids/Distractions (PIs): Pre-sessions Hunches: Date Summary Returned: 24 Feb 95 D. EVALUATION DATA: Viewer Confidence (H/M/L): Evaluator's Estimate E. INFORMATION: Drug interdiction activities ~rp pl anned by USCENTCOM for the April/May time frame. Aircraft activity will take place. Currently, USCENTCOM is in the planning stages. Activity could take place in the Southern Hemisphere. Call sign JSN phonetically surfaced to be used during high activity. Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 TASKING SHEET SOURCE NO: 079 DATE: 22 Feb 95 SUSPENSE: 24 Feb 95 1200 Hrs 1. PROJECT NUMBER: 95-284-0 2. METHOD/TECHNIQUE: Method of Choice 3. BACKGROUND: This is phase I of an on-g ing tasking. 4. ESSENTIAL ELEMENTS OF INFORMATION: Access and describe the type and location(s) of planned activities that are scheduled for Apr-May 95 time frame. 5. COMMENTS: Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 Approved For Release 2000/08/08 : ClArRDP96-00789ROO2500060024-3 TASKING SHEET SOURCE NO: DATE: 22 Feb 95 SUSPENSE: 24 Feb 95 1200 Hrs 1. PROJECT NUMBER: 95-284-0 2. METHOD/TECHNIQUE: Method of Choice 3. BACKLGROUND: This is i3hase I of an on-going tasking. 4. ESSENTIAL ELEMENTS OF INFORMATION: Access and describe the type and location(s) of planned activities that are scheduled for Apr-May 95 time frame. 5. COMMENTS: Coordinates: 703218/294875 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 USCENTCOM Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 Approved For Release 2000/08/08 : CIA-14DP96-00789RO02500060024-3 TASKING SHEET SOURCE NO: 025 DATE: - 22 Feb 95 SUSPENSE: 24 Feb 95 1200 Hrs 1. PROJECT NUMBER: 95-284-0 2. METHOD/TECHNIQUE: Method of Choice 3. BACKGROUND: This is phase I of an on-q ing tasking. 4. ESSENTIAL ELEMENTS OF INFORMATION: Access and describe the type and location(s) of planned activities that are scheduled for Apr-May 95 time frame. 5. COMMENTS: Approved For Release 2000/08/08 : CIA-RDP96-00789ROO2500060024-3 Approved For Release 2000108/08 : CIA-RDP96-60789RO02500060024-3 SESSION INFORMATIO A. TARGET DATA: Task/Target No. :95-284-0 session No. :01 B. PERSONAL DATA: Source No. :025A Monitor's No. :N/A Beacon/Sander No. :N/A C. SESSION DATA: Date Task Received :22 February 1995 Session Date :23 February 1995 Start Time :1:00 Stop Time :2:00 Method Used :ERV Aids/Distractions (PIs) :N/A Pro--session Hunches (Avs) :N/A Date Summary Returned :24 February 1995 D. EVALUATION DATA: Viewer's Estimate :N/A Evaluator's Estimate E. SESSION SUMMARY Certain planned activities are scheduled for the April-May 95 time frame. Shipments of drugs from Columbia to as far as Mexico will be delivered. A drug cartel or organized smuggling group, headed up by one powerful man in particular, is planning shipments of narcotics. These shipments in the future will be made by air flight utilizing planes and airfields. Drug drops are made from above in six weeks from now for a sizeable profit. Approved For Release 2000108/08: CIA-RDP96-00789ROO2500060024-3