Approved E"WSQQI:,-,i&08.N*flf)P96-00789ROO2500230042-4 %ld "%J IN" TO: PA SGU FROM: THRU: PAG-TA SUBJ: ACTIVITY REPORT FOR NOVEMBER 1993 DATE: 2 DECEMBER 1993 1. (U) The following activities were accomplished by myself during the month of November 1993. 2. (U) Move to Building 2845: - Conducted office space survey within Building 2845; final office and administrative space selection and assignments completed with PAG-TA personnel. - Cost Estimate for th(S(;;J)gistruction upgrading of Room 111 received from Ft. mpadp Rnainpers. Cost Estimate packet hand carried to Mr. ! . DAL-2A, for processing. 'p-2 (Physical - Face-to-face meeting with S(:P~ Security) , to discuss requirements neceqEaxiv to upcfrade Room 111 to a SCIF-level facility. Provide-d with a courtesy copy of cost estimafe packet. in turn, provided me with copies of the new DCID 1/21 regulation as well as the updated supplement to DCID 1/21 covering the physical security standards for SCIFs and the latest version of the Fixed Facility Check List. 3. (SINF) Projects: Conducted 5 operational projects involving ten sessiong. - Included a f ace-to-f ace meeting with costumer which involved 4 of the aforementioned projects. 4. (U) Foreign Assessments: C1.4 - Attended a two'conference on Non-Lethal Warfare at the Johns Hopkins Applied Physics Lab 16-17 November 1993. - ongoing evaluation of material collected by former branch chief. 5. (U) Training: Participated and completed a 'IQ-Sort" personality examination as part of the SAIC R&D portion of our mission. 6. (U) Other: On Annual Leave from 22 to 26 November 1993. CLASSIFIC lay QECLAS c,!Fy Approve%A I U0 b"BP96-00789ROO2500230042-4 AV= 1JVI