Approved For Release 2001/03/01,%Q&-&,0788ROO2000150001-4 DEPARTMENT OF THE ARMY US ARMY INTELLIGENCE AND SECURITY COMMAND FORT GEORGE G. MEADE, MARYLAND 20755 IAFM-OPS-HUP 16 May 1979 MEMORANDUM FOR THE RECORD SUBJECT: Initiation of INSCOM GRILL FLAME Project (IGFP) Contract Phase (U) 1. (S) On 14 Yay 1979, the first of six selected INSCOM personnel began training in remote viewing (RV) at SRI, Menlo Park, California. Attached hereto is a handout which SRI provided explaining the planned activities at SRI during the initial phases of the training cycle. 2. (S) One RV session was conducted while the undersigned was at SRI. It was very successful and all were glad to get off to a good start. 3. (U) Of particular note to the undersigned was the lack of OPSEC at SRI. Much of their work is unclassified and it appeared as though there was a lack of respect for security of the IGFP. 4. (S) SRI personnel have proposed the use of a PSE,as an evaluation aid. They plan to use the PSE on the RV session tapes produced by IGFP remote viewers. The MI community has generally taken a dim view of the use of a PSE because it can be employed clandestinely against a suspect or subject of an investigation, Obviously, SRI does not plan or propose such a scheme. But perhaps OACSI should make a legal determination in this matter similar to the one governing the use of record- ing devices in the IGFP. Attached is information explaining the PSE which was obtained from Tech Div, 902d MI Group. CLASSIFIED BY: Director, DIA DECLASSIFY ON: 16 Afay 99 EXTENDED BY: Director, DIA REASON: 2-301-C (3) (6) J"hZ'.7?96-00 Approved For Release 2001/03/Q,%; iftERVITTIVAME dLURL I 'Approved For Release 20Vw iUvialliWA-RDP96-00788ROO2000150001-4 IAFM-OPS-HUP 16 May 1979 SUBJECT: Initiation Of INSCOM GRILL FLAME Project (IGFP) Contract Phase (U) 5. (U) Contractor personnel have requested a two week break in the training cycle from 2 through 13 July 1979. A tentative agreement was reached that Colonel Hamel and Major Watt would meet with contractor personnel the week of 16 July 1979 to determine which trainees will continue the follow-on portion. Incl RICK H. ATWATER as 1LT, MI Operations Officer, IGFP 2 Approved For Release 2001103/07 6-00788ROO2000150001-4